    Overview

    Waste incineration is arguably the most demanding compliance duty in environmental monitoring, because the emission limit is set for a continuous monitoring system rather than a periodic test, and because dioxins and furans — among the most toxic substances measured in routine environmental work — must be determined alongside the conventional pollutants.

    The compliance picture

    Emissions are assessed against a named method, not against a concentration in isolation. The table below lists the parameters this sector is regulated on, the methods that apply, and what each method actually determines.

    Parameter Method / standard What it determines
    Continuous emission monitoring HJ/T 75-2017 · HJ 75-2007 CEMS with data validity requirements, not periodic sampling
    Particulate matter GB/T 16157-1996 · HJ/T 48-1999 Isokinetic gravimetric as the reference against CEMS
    Dioxins and furans GB 16445-2014 · HJ/T 295-2009 Combined sampling with subsequent high-resolution analysis
    Heavy metals HJ 700-2014 class Particulate-bound metals requiring digestion
    Acid gases SO₂ / NOₓ / HCl / HF HJ 1131-2020 · HJ 1132-2020 Constant-potential electrolysis
    Low-concentration particulate DB37/T 2537-2014 For plants with a stringent particulate limit
    Unattended particulate HJ/T 397-2007 Continuous beta-ray or equivalent, with a valid data rate requirement

    Recommended instrument set

    The following combination covers routine compliance testing, screening ahead of a full test, and the reference data a defensible submission needs. Every model is configurable at order — state your range, gas and output protocol and the configuration will be confirmed in the quotation.

    Task Model Key specifications Standards
    Dioxin and heavy metal stack sampling 3030B
    Exhaust Gas Dioxin, Heavy Metal, / Organic Compound Integrated Tester
    21 variants, solution absorption, up to 120 L/min GB/T 16157-1996 · GB 16445-2014 · HJ/T 47-1999
    Reference particulate against CEMS 3012H-D
    and Low-Flow Rate Fixed Source Emission Integrated Tester
    1 mg/m³ lower limit — required where limits are tight GB/T 16157-1996 · HJ/T 47-1999 · HJ/T 48-1999
    Routine particulate with full gas suite 3012H
    Stack Dust Sampler / Flue Gas Analyzer
    isokinetic, multi-gas HJ/T 48-1999 · JJG 968-2002 · JJG 680-2007
    Unattended continuous particulate monitoring 1089K
    Beta-Ray Stack Dust Sampling Probe
    beta-ray with heated probe, 8 provincial methods GB/T 16157-1996 · HJ/T 397-2007 · DB15/T 2362-2021
    Acid gas screening before a full test 3023
    UV Dual Flue Gas Comprehensive Analyzer
    UV differential, fast response GB/T 16157-1996 · GB/T 37186-2018 · HJ/T 47-1999
    Two-channel capture for metals and acid gases 3072
    Dual-Channel Flue Gas Sampler
    dual independent paths, absorption bottle on heated gun GB/T 16157-1996 · HJ/T 47-1999 · HJ/T 397-2007
    Moisture, which corrections depend on 1062E
    Moisture Content Multi-Function Detector
    capacity method, also measures velocity and pressure GB/T 16157-1996 · HJ 836-2017 · T/SSESB 1-2000

    Common challenges in this sector

    The problems below come up repeatedly in enquiries from this sector. They are engineering constraints, not sales objections, and the right answer is to specify around them rather than discover them on site.

    The limit is continuous, so periodic testing cannot demonstrate compliance

    A CEMS with a valid data rate is the primary instrument; a reference stack test is what calibrates and validates it. Specify both. The 3012H-D at a 1 mg/m³ lower testing limit exists because the standard configuration cannot measure the concentrations a tight incinerator limit produces.

    Dioxin sampling is sampling-limited, not analysis-limited

    The mass you can recover is set by the volume you can draw cleanly. An unreliable flow figure, a leak in the train or a filter that was not weighed to the required resolution destroys the result before analysis begins. Use the 3030B with its dedicated sampling train and document the flow at every stage.

    Moisture is not a housekeeping parameter — the corrections depend on it

    Stack gas measurements are reported dry or wet depending on the method, and the two differ by enough to fail a limit. Measure moisture in the same run using the 1062C or 1062E rather than borrowing a value from a previous test.

    Data availability is a compliance requirement in its own right

    The regulator assesses not just the concentration but the percentage of valid data. An instrument that drifts, needs frequent manual zeroing or loses its data link will fail on availability even when the numbers are compliant. Specify automatic fault detection and data storage capacity.

    Documents to have ready

    Having the applicable documents in hand before the enquiry shortens the quotation cycle and avoids specifying an instrument against the wrong method. These are the references most frequently requested in this sector.

    • HJ/T 75-2017
    • GB 16445-2014
    • GB/T 16157-1996
    • DB37/T 2537-2014
    • HJ/T 397-2007

    Request a quotation for this sector

    Tell us the facility type, the parameters you need to measure, your emission limits, the method framework your report must follow and your target delivery date. An engineer will reply with a configuration recommendation and a price — normally within one working day.

    Sector: Emission Monitoring for Waste Incineration Plants  |  Facility: ____________  |  Parameters to measure: ____________  |  Applicable method: ____________  |  Target delivery: ____________

    Request a Quote  ·  Standards & Methods reference